Renovation & Construction Management

One project manager owning the site, the trades, the schedule and the inspection sequence — so you are running a business, not chasing subcontractors.

Typical timeline
8–16 weeks

Most operators who self-manage a buildout discover the same thing around week four: it is a full-time job, and they already have one.

Coordinating a food buildout means sequencing eight or ten trades whose work depends on each other, booking inspections that have to happen in a specific order, chasing deliveries, and resolving the daily stream of small decisions that stop work if nobody answers them. Miss one inspection in the sequence and the drywall goes up over plumbing that was never signed off — then comes back down.

A single point of contact

You get one project manager who owns the site. They procure and schedule the trades, supervise against the permitted drawings, and hold the inspection calendar.

Practically, that means you get one phone call a week with a real update rather than nine numbers in your phone and a different story from each. When something goes wrong — and on a renovation something always goes wrong — you hear about it with a proposed solution and a cost impact attached.

Renovations surface things drawings cannot predict

New builds are more predictable. Renovations are where the surprises live, because until demolition opens a wall nobody knows what is behind it.

We have opened ceilings to find undersized gas lines, sanitary stacks that were not where any record drawing showed, structural members that could not take a rooftop unit, and previous work that was never permitted and had to be brought up to code before anything new could be approved.

This is why our budgets carry a real contingency line rather than a token one, and why we walk a space thoroughly before pricing it. The goal is not to eliminate surprises — it is to have already priced the likely ones.

Change orders, controlled

Scope changes. An operator sees the room framed and wants the pass-through moved. That is legitimate, and sometimes worth doing.

What is not acceptable is finding out what it cost after the fact. Every change gets priced, scheduled and approved in writing before the work happens, including its effect on the opening date. Sometimes that conversation ends with the change being dropped, which is exactly the point.

Closing out properly

Between “the work looks finished” and “you can legally open” sits the deficiency list and the final inspection sequence.

We carry that list, chase the trades who need to return, and book the inspections in the order that lets them pass. A project is not complete when construction stops. It is complete when you have occupancy, the health unit has signed off, and the kitchen has been commissioned.

What you receive

  • A construction schedule showing the trade sequence, the inspection hold points, and the dates your decisions and selections are due
  • A weekly written report with site photos, the work closed out that week, and the next two weeks of booked trades and deliveries
  • A change order log with every item priced and signed, carrying a running total against the original contract value
  • The permitted drawing set kept on site and marked up as built as work proceeds, so what was actually installed is on record
  • An inspection record collecting the municipal, ESA and TSSA sign-offs in one place as each is issued
  • A close-out package with equipment manuals, warranty certificates, trade and supplier contacts, and the deficiency list signed complete

What we need from you

  • Site access — keys, alarm codes, and landlord approval for work hours, loading and elevator use
  • Finish and fixture selections confirmed by the dates on the schedule. Tile, millwork and lighting are the usual holdups
  • Progress payments released at the agreed milestones so trades stay booked and material orders stay live
  • Delivery dates for anything you are supplying yourself. Owner-supplied equipment that lands late stops mechanical and electrical rough-in

Not included

  • Base building work the landlord owns under your lease — roof, structure, and service capacity to the unit. We identify it and push for it, but we do not perform it unless it is added as scope.
  • Permit fees, development charges and utility connection costs, which are paid to the municipality and the utilities rather than routed through us.
  • Design drawings and stamped engineering, quoted separately — drawings under our design service, and stamped engineering by the licensed engineers we work with.

Questions about this service

Can I keep operating while you renovate part of the space?

Yes, in phases, if the layout allows a hard separation. We build a hoarding around the work area, maintain the dust and pest barriers a health inspector expects to see, and push noisy or shutdown work outside service hours. Phased work costs more and runs longer than an empty-space build, because trades mobilize twice and work in shifts. We price it that way from the start.

Do you use your own crews, and can I bring in my own trade?

We subcontract to licensed trades and supervise them on site. You can bring your own contractor for a defined scope, and some owners have a plumber or a millwork shop they trust. Two conditions: current WSIB clearance and liability insurance, and they work to our schedule. Anything you contract directly is yours to warranty. We coordinate their access and inspections like any other trade.

What happens if the work fails an inspection?

The inspector writes the deficiency, we correct it and rebook. Who pays depends on cause. Work that failed because a trade did not build to the permitted drawings is corrected at that trade's cost. A failure caused by an inspector reading a condition differently than the drawings showed is a change, priced and approved like any other. We carry the item until it clears.

Free Consultation

Tell us what you want to build.

The first consultation is free. You get a project review, a realistic timeline and a preliminary cost breakdown — including an honest answer if the project does not work as scoped.

Mon – Fri, 9:00 a.m. – 5:00 p.m. · No obligation

Call usStart your project