Skip to content

F.A.Q

The questions operators actually ask.

Grouped by the stage they usually come up in. If yours is not here, the first consultation is free — ask us directly.

Questions
20
Topics
5
Consultation
Free
Response
1 business day

Design & Construction

What's included in NHFC's design service?

We produce the complete drawing set a municipality actually asks for: architectural floor plans, equipment layouts, reflected ceiling plans, and the mechanical, electrical, and plumbing drawings that go with them. That covers restaurants, cafés, grocery stores, bakeries, and food production facilities. The set is drawn to the Ontario Building Code from the start, so exhaust hood sizing and make-up air, plumbing fixture counts, grease interceptor placement, and barrier-free clearances are resolved on paper rather than argued about on site. You receive a stamped, permit-ready package plus the working drawings your trades build from.

Can NHFC handle both design and construction?

Yes. NHFC is a turnkey firm, which means one team designs the space, pulls the permits, tenders and manages the trades, and oversees the build through final inspection. You are not coordinating an architect, a general contractor, an equipment dealer, and a permit expediter who each blame the other when something does not line up. Because the people who drew the hood, the gas line, and the electrical service are the same people scheduling TSSA and ESA inspections, changes get resolved in hours instead of weeks. One contract, one project manager, one accountable party at handover.

Do you work on renovations or only new builds?

Both. A large share of Ontario food projects are renovations of second-generation space, and those carry their own problems: undersized electrical service, a hood that was never balanced for make-up air, a grease interceptor that no longer suits the menu, or washrooms that predate current barrier-free requirements. We survey what is actually there, tell you what can be reused, and design around it. New builds and cold shells get the same treatment from a blank slate. Either way, the finished space is designed and delivered to current code, not to whatever was acceptable when the building was last touched.

How long does a typical design and build project take?

Design and permitting typically run four to eight weeks, covering drawings, public health unit plan review, and the building permit application. Construction and equipment setup typically run eight to sixteen weeks depending on square footage, how much mechanical and electrical work is involved, and whether the space is a cold shell or a second-generation restaurant. Those windows assume the landlord’s base building is ready and that decisions come back promptly. The most common causes of slippage are late menu or equipment changes and slow municipal review cycles, both of which we plan around rather than discover late.

Permits & Compliance

Can you help get city and health permits?

Yes, and it is one of the reasons owners hire us. We prepare and submit the full application package to the city and to your local public health unit, then coordinate directly with plans examiners, health inspectors, and the fire prevention office until approval lands. That includes the building permit, the food premises plan review, and the sign-off trail for gas appliances through TSSA and electrical work through ESA. We track every comment letter and resubmission so nothing sits waiting on an unanswered question. You get status updates rather than a stack of forms.

What if my project has strict health or fire code requirements?

Complex requirements are normal in food service, not an exception. Open-flame cooking drives Type 1 hood and fire suppression design, make-up air balancing, and fire separation details. High-volume prep drives handwash sink placement, finish schedules, and grease interceptor sizing under the local sewer-use by-law. We work with licensed engineers and certified inspectors on the mechanical, electrical, and fire suppression scope so the design satisfies the Ontario Building Code, the Fire Code, and your public health unit before it goes for review. Difficult conditions are engineered around, not discovered during a failed inspection.

Do you handle zoning or occupancy changes?

We do. Before a lease is signed we run a zoning review to confirm the unit permits a restaurant, take-out, or food processing use, and to flag parking, patio, and exhaust discharge conditions that come with it. If the space was previously retail or office, the project needs a change-of-use application, which usually triggers a fresh look at occupant load, exiting, washroom counts, barrier-free access, and fire separations. We prepare that submission, carry it through review, and close out the occupancy permit. Catching a zoning conflict before you commit to a lease is the cheapest fix available.

Can you speed up the permit process?

Review timelines belong to the municipality and the public health unit, and no consultant controls them. What we control is everything that causes delay. Most lost time comes from incomplete submissions, drawings that contradict each other, or a comment letter that sits unanswered for two weeks. We submit complete packages the first time, sequence the building, health, gas, and electrical approvals so they run in parallel where possible, and respond to reviewer comments within days. Familiarity with how individual Ontario offices process food premises applications keeps a project moving through the queue rather than stalling in it.

Equipment & Sourcing

Do you supply commercial kitchen equipment?

Yes. We source through established Canadian and North American suppliers covering cooking lines, refrigeration, dishwashing, bakery equipment, food production machinery, and front-of-house fixtures. Because we design the space and buy the equipment, the spec sheet and the drawings agree: utility rough-ins, clearances to combustibles, hood coverage, and drain locations are set from the actual model being installed rather than a generic allowance. That avoids the classic problem of a fryer arriving with a gas connection the plumber never roughed in. We can also work with equipment you already own or have sourced elsewhere and design around it.

Can you install and set up the equipment?

Installation is part of the scope. We schedule delivery to match construction so equipment is not sitting in a finished dining room for a month, then handle rigging, placement, levelling, and connection to gas, electrical, water, and drainage. Gas-fired appliances are connected and commissioned by licensed technicians for TSSA sign-off, and electrical connections are completed for ESA inspection. Hoods are balanced with make-up air, refrigeration is charged and temperature-logged, and every unit is tested under load before handover. You also get the manuals, warranty registrations, and a walkthrough with your kitchen staff.

How do you make sure equipment meets regulations?

We specify only commercial-grade equipment from manufacturers whose units carry the certifications Canadian authorities look for: CSA or equivalent electrical and gas approval for the Canadian market, and NSF or equivalent sanitation listing for food-contact surfaces. Residential-grade appliances and grey-market imports without a Canadian certification mark are a common reason projects fail inspection, and we do not put them in a kitchen. Certification documentation is compiled and submitted with the health and building review package, so the inspector can verify each unit rather than asking you to prove it after installation.

Can you source specialized or custom machinery?

Yes. Beyond a standard cooking line we regularly source walk-in coolers and freezers built to the room, custom stainless fabrication, food packaging and portioning equipment, bakery ovens and proofers, and production machinery for facilities that manufacture rather than serve. Specialized machinery usually has long lead times and non-standard utility demands, so we lock the spec early and design the electrical service, floor loading, drainage, and ventilation around it. Where a unit requires a Canadian field evaluation before it can be energized, we identify that at the sourcing stage instead of on the day of inspection.

Financing & Costs

Do you provide financing or lease options?

We work with trusted Canadian financing partners who offer lease-to-own and equipment financing programs for food businesses. That lets you keep working capital for inventory, staffing, and the first few months of operation rather than putting it all into stainless steel on day one. Structures vary: full equipment packages, single high-cost items such as refrigeration or a cooking line, and in some cases fit-out costs. Approval, rates, and terms are set by the lender based on your business profile, not by us. We make the introduction, assemble the equipment schedule they need, and coordinate funding with the build schedule.

How do I know what my project will cost?

After the initial consultation and a site visit, you get a written quote broken into design and permitting, construction, and equipment, so you can see where the money actually goes. The number is built from your menu, square footage, and the condition of the space, because a second-generation restaurant with a usable hood and adequate electrical service costs very differently from a cold shell. We flag the variables that move the total most, such as mechanical upgrades, grease interceptor work, and service capacity. No hidden allowances that quietly become change orders later.

Are consultations free?

Yes. The first consultation is free and it is a working session, not a sales pitch. We review your concept and menu, look at the space or the shortlist of spaces you are considering, and give you an honest read on feasibility, including zoning use, whether the unit can support your ventilation and electrical needs, and what a change-of-use application would involve. You leave with a timeline estimate and a preliminary cost breakdown you can take to a lender or a landlord. Call (226) 336-9954 or email info@nhfc.ca to book one.

Can you work within my budget?

We design to the budget rather than designing first and asking you to find the money. Tell us the number early and we will show you where it can be spent to the best effect and where it cannot be cut. Some things are non-negotiable because code requires them: hood and make-up air, grease interceptor, barrier-free washroom access, adequate electrical service. Others are genuinely flexible, including finishes, millwork, seating, and whether certain equipment is new or reconditioned. The goal is a kitchen that passes inspection, runs efficiently, and does not consume the capital you need to open.

Process & Timeline

How does your turnkey process work?

Four stages. Discover: we review your concept, menu, and site, run the zoning and use check, and produce a budget and timeline. Design: architectural, mechanical, electrical, and equipment layout drawings, coordinated to the Ontario Building Code and your public health unit’s plan review requirements. Build: permits issued, trades mobilized, construction managed through TSSA gas and ESA electrical inspections. Deliver: equipment commissioned, final inspections passed, occupancy granted, keys and documentation handed over. Each stage ends with a decision point where you sign off before we spend money on the next one.

Who manages the project during construction?

A dedicated NHFC project manager owns your build from permit issuance to handover. They schedule and supervise the trades, chase equipment deliveries against the construction sequence, book the municipal, TSSA, and ESA inspections, and answer to the plans examiner and health inspector on your behalf. They are your single point of contact, so you are not fielding calls from six subcontractors who each need a decision. When a site condition forces a change, the project manager brings you the options and the cost impact before work proceeds, not after the invoice arrives.

How do I track progress?

You get regular written updates from your project manager covering what was completed, what is scheduled next, where permit and inspection approvals stand, and anything that could affect the opening date. Each stage closes with a milestone review, and you are welcome on site for walkthroughs at the points where they matter most: after rough-in and before walls close, once the hood and make-up air are set, and at equipment commissioning. Photos and inspection records are kept as the project runs, so there is a documented trail rather than a verbal account.

What happens after project completion?

Completion means a full handover, not a set of keys on the counter. Every piece of equipment is tested under load, refrigeration temperatures are verified, and the hood and suppression system are commissioned. Final building, fire, gas, and electrical inspections are closed out and the occupancy permit is in hand before you open. You receive manuals, warranty documentation, as-built drawings, and a maintenance schedule. Post-launch consulting is available for the first weeks of trading, when kitchen workflow, staffing, and equipment settings usually need adjusting against real service volume.

Still have a question?

Ask it on the free consultation. You will get a straight answer, including when the answer is that your project needs something we have not listed here.

Book a Free Consultation

Free Consultation

Tell us what you want to build.

The first consultation is free. You get a project review, a realistic timeline and a preliminary cost breakdown — including an honest answer if the project does not work as scoped.

Mon – Fri, 9:00 a.m. – 5:00 p.m. · No obligation

Call usStart your project